John M. Conte 612 Tappan Street, Forked River N.J. 08731 (609) 693-1645 or (973) 632-4735 Cablevision
(Contractor through Rightech, Inc Temp.) 9/2012 to 11/2015 40 Pine Street Tinton Falls, N.J. WIFI Deployment Engineer Responsible for the Engineering, Designing and Deployment of WIFI
equipment for New Jersey Transit- NJ North East corridor WIFI project. ·
Managed
outside contractors and designed WIFI layouts for New Jersey Transit- NJ
North East corridor large scale Wi-Fi build out project at all train stations
throughout NJ. ·
Coordinated
with NJT for NJT Communication rep and Flag Safety rep’s to meet at stations
for construction builds. ·
Supervised
outside plant construction builds and the deployment of WIFI units throughout
the state of NJ. ·
Lead Tech
for any WIFI outages at any of NJT Train Stations. ·
Tested
fiber connections from NJT Train Stations to Cablevision head ends and all
fiber and cat5 connections from switches to AP’s at each location. ·
Lead fiber
technician at each location for station activations. Comcast 4/2010 to 3/2012 650 Centerton Road Moorestown, N.J. Deployment Engineer The Engineering and Deployment of Equipment for both Cell Backhaul and
Metro Ethernet projects through Comcast’s NETO (National Engineering and
Technical Operations) Division. · Deployment of telecom equipment to both cell
sites and in customer MSC’s to enhance bandwidth and service on their 3G and
4G Networks. For major customers such as T-Mobile, Sprint and Verizon
Wireless. · Inspected construction of upgrades at each cell
site location to ensure contractors were building sites to Comcast Standards. · Supervised MSC builds for T-Mobile, Sprint and
Verizon Wireless to be sure they were built to Comcast standards and
specifications. · Helped develop Comcast Cell Site Construction
Engineering Standards · Helped develop Comcast Cell Site Inspection
Standards · Worked hands on alongside local market technicians to help
turn cell sites up by testing fiber connectivity, installing Cisco Small
Form-Factor Pluggable (SFP) Transceiver into Ciena 311V’s (Service Delivery Switch) also plugging in
appropriate fibers so sites can be turned up and tested before being handed
over to the customers. · Responsible helping my assigned local markets
in any way possible to ensure towers and MSC’s were built, turned up, tested
and handed over to customer. · Markets responsible for included Baltimore,
Atlanta, Washington, Chicago, Indiana, Wisconsin, Rhode Island, New Hampshire
and Greater Boston. · Performed full audits of all equipment and
fiber on the entire Comcast backbone. Reports entailed all rack elevations
front and rear drawn on Netzoom 11, a spread sheet on each fiber run, all
electrical information and connection information also a detailed list all
extra equipment left onsite. · Prepared full rack elevations showing all
deployed equipment using Netzoom11 for all Sprint MSC builds and Verizon
Wireless Martha’s Vineyard build. · Equipment deployed consisted mostly of Juniper
mx960 routers, Ethernet/IP transport gear, Ciena LE-311v Service Delivery Switch, Minara XFP 50GHz full C-band tunable OTN XFP
Module with integrated G.709 framer, OAM and Forward Error Correction and
Cisco Small Form-Factor Pluggable (SFP) Transceiver, Cisco 2911 Intergraded
Service Routers, Brix Verifier 3000, Telec GMT fuse panels, ADC patch panels,
DWDM panels and Corning OSP fiber panels. VERIZON
(CONSULTANT) 12/2007 to 7/2009 (Consultant through Hepco Inc) 15000 Midlantic Drive Mount Laurel, N.J. completed 18
month contract 3/2006 to 9/2007 (Consultant through RJE Telecom) Verizon 500 Summet Lake Dr. Valhalla, N.Y. completed 18
month contract 9/2004- 6/2005 (Consultant through National Engineering) Henkeles & McCoy Bluebell, Pa. completed 9
month contract 9/2003- 7/2004 (Consultant through HEPCO INC.) Verizon Teaneck N.J. completed 9
month contract Mount Laurel, N.J. NETWORK CREATIONS ADMINISTRATOR (FTTP) Duties included the process of FIOS Engineering Work Order completion
packages, known as, (Redlines). These packages include all the necessary
documentation the NCA requires to perform the detailed review, analysis and
corrections to create the network elements necessary to deploy FIOS. This
process requires the knowledge and use of the following systems: -
IDDS - (Integrated Digital Drafting System) –
Mechanized AUTO CAD Engineering records and drafting system. -
ICGS (Integrated Computer Graphic System) – Data
base system that contains all OSP (Outside Plant) network elements. -
Peoplesoft – Corporate Accounting System that
inventories all OSP Investments. -
Microsoft Excel – Used to tract various
administrative reports. -
Asset Verification – Used to ensure that the
Corporate Assets are recorded accurately. -
IVAP – used to record the customer assignment
data so FIOS service orders can be generated. -
VBUILD – Web based application for tracking the
building of the OSP elements. Valhalla,
N.Y. OSP
ENGINEER/ PROJECT MANAGER (FTTP) This entailed Documentation of Site Surveys and Fiber Optic
Engineering Plans, placement of FDH's, FDP's & Fiber cables, also
assigning fibers along the way, for all jobs aerial and buried. Drawing
revisions of jobs, using the programs VISEO and ECRIS Print Manager (a Fiber
Tracking System). Riding jobs with the Splice & Line Foreman for the
construction approval before handing it off to construction to build.
Ensuring all equipment and network additions were completed on time and
within budget. Bluebell,
Pa. OSP
ENGINEER/ PROJECT MANAGER (FTTP) Engineered new FTTP (fiber to the premise) for Verizon. This entailed
documentation of site surveys, Fiber Optic Engineering Plans, the placement
pf FDH’s (fiber distribution hubs), FDP’s (fiber distribution panels) also
different sized fiber cables, assigning fibers along the way, using VISEO to
draw out the site plans. Ensuring equipment and network additions were
completed on time and within budget. Teaneck
N.J. OSP
ENGINEER/ PROJECT MANAGER (FTTP) Completed a 7 month contract with Verizon as an Outside Plant (OSP)
Engineer. This entailed Documentation of Site Surveys, Fiber Optic engineering
Plans, placement of FDH's, FDP's & Fiber cables, also assigning fibers
along the way. Ensuring all equipment and network additions were completed on
time and within budget. NETWORK
PLUS 2000 – 2003 One World Trade Suite 8104, 81st floor After 9/11/01 601 West 26th Street New York, NY OSP-INsight Project Manager Led a team responsible for successfully placing the company's entire
network into a OSP-Insight, MapInfo based graphics/database program. This involved the inventory of all network elements: fiber optic
cable, transmission equipment and associated frames, buildings, risers,
conduit, manholes, etc. Project also included linking all associated splice drawings to their
respective manholes, enclosures and LGX panels. Mapped all cables from their
equipment terminations to LGX panel and jack assignments. This system is used
for tracking network troubles by the NOC (National Operations Center). Conducted Site Surveys and created detailed drawings for city
approvals and permits. Responsible
for supervising construction crews for all new fiber optic cable jobs from
point of entry to fiber terminations at customer locations and common space
areas in buildings in all five boroughs in New York. Supervised on site fusion splicing and construction crews. Teleport
Communications Group (TCG) 1995 to 1998 75 Broad Street New York, NY & Dayton,
NJ AT&T
Local Service (TCG) 1998 - 2000 (AT&T acquired TCG in July of
1998) 67 Broad Street NYC, NY & One World Trade Suite 5702 57th flr Project Manager Lead a ten-person team on project to replace Geonet (a graphics
tracking program). I had coordinated vendor meetings to elicit proposals of a program with
the capabilities and demonstrations of potential replacement of selected
programs. Once the product was selected I initiated budget proposals for the
purchase and implementation OSP-INSight to replace Geonet. Formed and led team to standardize OSP-INSIGHT program procedures for
entire AT&T Local Service organization throughout the 43 city footprint. Geonet Applications Support I provided first and second tier Support for the Geonet system. Managed inventory of all fiber optic cable in the cities served by
AT&T Local Services. Provided onsite training for Geonet system enhancements in all 43 cities Developed AT&T Local Service standards used nationally for Geonet system. Cable Management Systems / Building Cable Management Systems Project
Manager Responsible for all inside plant and outside plant construction and
splice drawings. Managed 5 person team responsible for
maintaining the Cable Management Systems / Building Cable Management Systems
(CMS/BCMS) Maintained inventory of all fiber and copper cables for TCG's type I
and type II service in all five boroughs of New York Managed inventory and tracking of all conduit, manholes, poles, hand
holes, tunnels, bridges that were owned, rented or leased in the state of New
York. Assistant OSP Engineer Responsible for assigning both fiber and copper pairs for customers. Conducted site surveys and created job drawings required for city
approvals and permits. 1992 to
1995 Great
Atlantic & Pacific Tea Company Montvale, NJ Designer / Drafter Restoration of store fixture plans. Upgrade interior and exterior elevations and floor plans of the
productivity of food stores and specialty departments. Interfaced with client companies to revise site plans and develop
budgets for construction and renovation projects. 1986-1992
Bell
Communications & Research (BELLCORE) Morristown,
NJ Supervisor,
Sr. Drafter / Designer Prepared
detailed equipment layouts of Subscriber Loop Carrier Systems for Bell
Atlantic. Prepared
detailed installation illustrations for fastening and bracing of equipment
assemblies for Northern-Telecom DMS-10 and DMS-100 systems. Graphics
specialist for mechanical and assembly detail drawings, proposals, block
diagrams, tables and other graphics needed by engineering department. Created and
issued Network Equipment Buildings Systems (NEBS) data sheets Updated the
on-line index and maintained the master library of issued NEBS data sheets.
Produced and distributed all information to the Regional Bell Operating
Companies. Designed
detailed fire protection drawings for the Common Systems Engineering Group
and Fire Technology AI Experts. Bellcore had a
down sizing and department was disassembled, took buyout. 1984
-1986 Grand
Union Company Elmwood
Park, N. J. Drafter
Analyzed store fixture plans for the purpose of upgrading the
productivity of food stores and of specialty departments. References: Ken Carroll.......CEO Instrumentation Engineering......201-819-5399 William McKeever … Verizon FTTP Engineering Southern NJ…609-462-5107 Education: 2000-2001 Network Plus Technical Training Intro to
MapInfo MapInfo I OSP-InsightMapInfo-advanced
1996-1999 TCG / AT&T Schooling CMS/BCMS: 160hrs. Toronto, Canada Management
Workshop: 40hrs. Dayton, NJ. Telecommunications: 24hrs. Staten Island, NY OSP
Engineering: 80hrs Dayton, NJ 5ESS System: 80hrs. Detroit, MI COLR for
Operations: 32hrs. Dayton, NJ Geonet: 160hrs. Owen Sound, Canada Microsoft
Office Suite: Excel, Word, Access, Power Point 1986 - 1993 Bell Communications & Research Schooling UNIX Wordmark I
& II AutoCAD Macintosh MacII MacDraw
Management Skills and Writing 1988 Computer Applications Learning Center, Morristown, N. J. Intro to AutoCAD, Certification after 140hr. program 1986 Passaic School of Drafting, Passaic N. J. Certificate for PC Design 1984 Passaic Community College, Passaic N. J. Certificate for Architectural and Electrical Design 200hr. program 1981-1983 School Of Modern Technology & Design, Paterson, N. J. Associates Degree in Architectural Design 1977-1980 Don Bosco Technical High School, Paterson, N. J. Drafting & general studies |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|